1.    Our representative will help you choose the color, texture or image for a perfect result. He will also take the necessary measurements to carry out the drawing.
  2.   Design and tracing of your stretch ceiling in our technical offices.
  3.   The Stretch Ceiling is custom made to your measurements in our factory. The ceiling is shipped within 10-15 working days.
  4. Installation.

                    

                            USER MANUAL                         

 

Have a look at the room. Prepare the device.

 

Install the base frame and the lamp stand with a spirit level.

 

 

Secure the foil with clamps and heat it up to 60-70ºC with a heat gun.

Insert the foil into the base frame.

 

Plug in the lights.

When installation is finished, air the room.

                Customer signs a supply contract.

         MAINTENANCE PROCESS

Do not touch the foil with sharp items

Do not set foil on fire

Do not cut off

Do not color the surface

 

If necessary, use a soft cloth and glass cleaner wipe.

Save

Save

Save

Save

Save