- Our representative will help you choose the color, texture or image for a perfect result. He will also take the necessary measurements to carry out the drawing.
- Design and tracing of your stretch ceiling in our technical offices.
- The Stretch Ceiling is custom made to your measurements in our factory. The ceiling is shipped within 10-15 working days.
- Installation.
USER MANUAL
Have a look at the room. Prepare the device.
Install the base frame and the lamp stand with a spirit level.
Secure the foil with clamps and heat it up to 60-70ºC with a heat gun.
Insert the foil into the base frame.
Plug in the lights.
When installation is finished, air the room.
Customer signs a supply contract.
MAINTENANCE PROCESS
Do not touch the foil with sharp items
Do not set foil on fire
Do not cut off
Do not color the surface
If necessary, use a soft cloth and glass cleaner wipe.